Next workbench building question
I'm ready to buy Douglas fir for the base, at BMR. They have 2x6x10' kiln-dried, and using https://www.opticutter.com/linear-cut-list-calculator this comes out to 8 boards.
Given the logistics of a small garage, I want to do all the rough cuts (1" larger than needed) immediately (i.e. stop at the Guild on the way back from BMR) and then let the wood acclimate in my garage for a week or two before milling.
Is there any reason that doing things in that order is a bad idea?